TWP Restoration Projects: Modeling Alternatives

Evaluating Tidal Hydraulics, Geomorphic Change, and Estuarine Habitats for different Restoration Alternatives

A Modeling Advisory Team (MAT) was created to assist the Elkhorn Slough Tidal Wetland Project teams in overseeing consulting efforts to evaluate the hydrodynamic, geomorphic, and ecosystem responses to a suite of large-scale restoration alternatives compared with a “no-action” alternative.  In November 2006, a consulting team headed by Philip Williams and Associates, Ltd. (PWA), was hired. Specifically, the alternatives being evaluated include:

Option 1:            No Action
Option 2:            Replicate historic conditions of the estuarine mouth
Option 3:            Decrease the size of the estuary’s opening under Highway 1
Option 4:            Decrease the tidal prism by muting Parsons Slough
Option 5:            New alternative developed by PWA

To learn more about the scope of this project, check out the RFP description or the Scope of Work and Project Schedule.


Schedule of Deliverables

 

Literature Review Memorandum: The first task in PWA’s scope of work was to complete a literature review of restoration projects conducted in the U.S. and abroad that are similar in scope to potential restoration options for Elkhorn Slough. 

Completed 2/2007 - click here to download

Restoration Concepts Memorandum

Completed 1/2007

100% Report: Model Calibration Report
(calibration & validation results)

Completed 5/2007

20% Report: The Future Evolution of Elkhorn Slough
(No action only; chapters on hydrodynamics, inlet stability, morphology & habitat at years 0, 10 & 50)

In Progress – due 6/2007

50% Report: The Future Evolution of Elkhorn Slough
(No action + 2 restoration concepts; chapters on hydrodynamics, inlet stability, morphology & habitat at years 0, 10 & 50)

In Progress – due 7/2007

100% Report: The Future Evolution of Elkhorn Slough
(No action + 4 restoration concepts; chapters on hydrodynamics, inlet stability, morphology & habitat at years 0, 10 & 50)

In Progress – due 9/2007

Conceptual Engineering Design

In Progress – due 3/2008

Final Project Report

In Progress – due 3/2008

 

Modeling Advisory Team (MAT) Working Group Current Participants:

John Callaway
University of San Francisco

Bryan Largay
Largay Hydrologic Sciences, LLC


Josh Collins
San Francisco Estuary Institute

John Largier
University of California-Davis

Robert Curry
California State University Monterey Bay

Barb Peichel1
Elkhorn Slough National Estuarine Research Reserve

Ed Gross
Bay Modeling

 

Jessie Lacy
U.S. Geological Survey

1 – Project Coordinator

 

Hydrodynamic and Ecosystem Response to Proposed Restoration Alternatives
(Ecosystem-Based Management) Consultant Team Leads:

Philip Williams and Associates, Ltd.

Jeff Haltiner1, Don Danmeier2, Bob Battalio, Peter Goodwin, Matt Brennan, Steve Crooks, David Brew


H.T. Harvey & Associates

Ron Duke, John Bourgeois

 

1 – Project Director, 2 – Project Manager

 

 

 

 


 

 

Elkhorn Slough Foundation | Elkhorn Slough National Estuarine Research Reserve
Visitors | Education | Research | Get Involved | Natural History | Kid's Corner


This page is maintained by


the Elkhorn Slough Foundation
Become a member today!