The final Philip Williams and Associates report on the projected effects of major actions on Elkhorn Slough hydrodynamics, geomorphology and habitats are posted below.
Final Report including figures and conceptual design drawings (Revised 080108)
ElkhornTWP-ReportFinal_TXT+FIGS rev080108.pdf (43MB)
Errors corrected in revised Final Report
ElkhornTWP Report Errata v4 to v4.1.pdf
Summary of comments on Draft Final Report
080505 PWA Final Draft Comments Response v2.pdf
Comments from individual reviewers on Draft Final Report
080505_ES_PWA_Response_to_Final_comments v2.pdf
Conceptual design drawing plan sheet
1869_SHT01_Plan.pdf
Conceptual design drawing of the new inlet
1869_SHT02_Inlet.pdf
Conceptual design drawing of the sill at Highway 1
1869_SHT03_Sill.pdf
Conceptual design drawing of channel fill
1869_SHT04_Fill.pdf
|